Tanzania

K’s Hospital in Mbeya, Mbeya District District, Mbeya Region

Supplement existing water supply with a SuMeWa water disinfection system.

K’S Hospital was built in 1994 as a high-rise building with 8 floors and has 80 beds. Around 150-200 patients visit the hospital every day for outpatient treatment. The occupancy rate of the existing beds is around 13%.

The hospital draws its water from its own borehole and the public water supply. The building’s water supply is provided by four tanks with a capacity of 5000 liters on a raised platform on the roof. Hot water is also prepared and fed in from the roof using solar energy.

Kann leer bleiben

Wichtige Daten:

Technology: SuMeWa water disinfection system

Performance: 150 to 200 patients a day

Input: Groundwater

Output: Drinking water

Year: 2024

Sponsor: Leopold Bachmann Foundation

Similar projects

Subscribe to our newsletter and find out more about our projects and engagements.